A REFINERY PRODUCTION SCHEDULING MODEL WITH OPERATION MODE TRANSITION BASED ON VARIABLE DRIVEN MODELLING APPROACH

A Refinery Production Scheduling Model with Operation Mode Transition Based on Variable Driven Modelling Approach

A Refinery Production Scheduling Model with Operation Mode Transition Based on Variable Driven Modelling Approach

Blog Article

Operation mode is widely used in a refinery production process, bringing great convenience to its daily operations.However, the refinery scheduling model with operation mode makes the scheduling model become large and thus difficult to solve.In this article, we present a new refinery teal horse blanket scheduling model based on Variable Driven Modelling (VDM) approach.

The proposed model is with less variables, less constraints, and less branching nodes compared with the existing read more works.Furthermore, VDM builds model from a novel aspect of variable (i.e.

variable-based), while the traditional method building model from rule aspect (i.e.rule-based).

The model built by VDM has a more stable form and better readability, and is beneficial for building a widely applicable and standard refinery scheduling model.The results of numerical experiments show computational advantages of the proposed model.

Report this page